| ![]() |
Sailing and Motor Yachts in Mahogany and Teak |
![]() |
14.3 tons on a low loader The lead ballast was driven to a crane. |
![]() |
Turning it on its side Using belts, we lifted the lead ballast up and turned it for the work on the side. |
![]() |
Pressure You can see from the way the tyres are being pressed down, just how much pressure a 14.3 tons of lead it causes. |
Top of page | ||
List of diary entries |
Next |
|