To the Homepage of Martin-Yachts

Sailing and Motor Yachts in Mahogany and Teak

The Mould framework 3

Mallengerüst

Giving shape

The finely aligned rods are fitted closely on both sides of the hull.


 
 
 
Mallengerüst

Optimising the form

Each rod is then glued in its exact pre-calculated position with the help of wedges and constraints.


 
 
 
Mallengerüst

Ideal hydrodynamic form

Great care and precision is necessary so as to achieve the designed ideal hydrodynamic form during lamination.
This explains why each phase of work is so time-consuming.


 
 
 
Mallengerüst

Perfect form

Now you can recognise the exact shape of the hull.


 
 
Mould framework
Top of page

 
Mould framework Previous phase Mould frameworkMould framework
Back to the list
Next phase Mould framework